The City of Brandon has put a new spin on driving back and forth to Sioux Falls, opening a new roundabout on West Holly Boulevard:
The first roundabout in Brandon officially opened Tuesday, after months of construction. The new installation is at the intersection of West Holly Boulevard and South River Park Avenue. It is the result of a corridor study between Sioux Falls and Brandon aimed at connectivity and improving traffic.
…The project cost about $2.3 million, according to the city of Brandon.
…Paul Ruster was among the first 100 people to use the roundabout when it opened Tuesday. “It’s pretty nice to use,” he told KELOLAND. “I’ve used them a lot in Sioux Falls, so it was pretty natural. It’s neat there is one in Brandon now.”
Tami Jansma, Brandon’s city engineer, talked with KELOLAND about the roundabout and the study behind it. She said the corridor study took 18 months and was a collaboration between Brandon and Sioux Falls, examining how expansion efforts and traffic could be improved. The construction of the roundabout took about seven months [Quinn Gienapp, “Brandon Opens First Roundabout,” KELO-TV, 2026.11.24].
The Sioux Falls Metro Planning Organization’s Rice Street/Holly Boulevard Corridor Study projects that daily traffic volume through this roundabout will increase from 11,000 in 2023 to 13,000 in 2028, 17,000 in 2040, and 20,000 in 2050.
This improvement in your daily commute is brought to you in part by the American Rescue Plan Act—i.e., President Joe Biden and the Democratic Congress of 2021.